BOQLY
0440 132 525 Book a 15-Min Free Call
Site engineer checking a fresh concrete pour beside reinforcement mesh and column cages
Sector · Site & Structure

Concrete, steel and formwork, measured to every pour.

Concreting and reinforcement takeoffs for in-situ and precast systems, from major structural elements to small pour details, to support cost control, procurement and scheduling.

Send Your Structural Drawings Book a 15-Min Free Call
Concrete volumesIn-situ and precast elements
Steel by bar sizekg or tonnes, BBS where required
Formwork areasFootings, columns and beams
What we measure

Three packages, one coordinated takeoff.

Concrete volumes, reinforcement weights and formwork areas are measured together from the same drawings, so the three packages always line up.

  • Concrete

    In-situ and precast concrete components, from footings and slabs to small pour details.

    In-situPrecastFootingsSlabsColumnsBeams
  • BBS where required

    Reinforcement

    Steel weights in kg or tonnes, broken down by bar diameter and type, with bar bending schedules where required.

    By bar diameterBy bar typekg / tonnes
  • Formwork

    Formwork surface areas for every formed face, including footing sides, columns and beams.

    Footing sidesColumnsBeams
Reinforcement

Steel weights, ready to order.

Reinforcement is reported in kilograms or tonnes and broken down by bar diameter and type, so you can request supplier quotes, order accurately and avoid over-supply on site.

  • Weights by bar diameter and bar type
  • Mesh measured separately from loose bars
  • Bar bending schedules, where required
Steel by bar diameter Illustrative
  • Ø10
  • Ø12
  • Ø16
  • Ø20
  • Ø25
  • Mesh
Built for the structure package

Price it, order it, pour it on time.

Cost control

Accurate concrete, steel and formwork quantities give you a firm basis for pricing structural work.

Procurement

Order concrete, steel and formwork materials against measured quantities, not estimates.

Scheduling

Element-by-element quantities help you plan pours, crews and formwork cycles.

You receive Marked-up drawingsShowing every element measured. Structured Excel reportsSet out in your preferred format. Get a Concrete & Steel Takeoff
Often measured together

Related trades we measure

View all 19 trades
Call Book a Free Call